When a new commercial building reaches practical completion in Ottawa, most business owners face a critical challenge: transforming a construction site into a pristine, inspection-ready space for immediate occupancy. Post-construction commercial cleaning is not a simple janitorial task—it's a specialised, multi-phase process requiring industrial-grade equipment, technical expertise, and meticulous attention to detail.
This comprehensive guide covers professional best practices, industry standards, Ottawa-specific regulations, and everything you need to know before opening your doors in Ottawa, Kanata, Orleans, Barrhaven, and surrounding areas.
Key Takeaways
TL;DR: Professional post-construction cleaning follows a three-phase process (rough, light, final) and typically costs $0.20-$1.00 per square foot in Ottawa. HEPA filtration is essential for removing construction dust safely.
| Quick Facts | Details |
|---|---|
| 🏗️ Best For | New builds, renovations, commercial spaces |
| ⏱️ Timeline | 3-14 days depending on size |
| 💰 Cost | $0.20-$1.00/sq ft in Ottawa |
| 📍 Service Area | Ottawa, Kanata, Orleans, Barrhaven |
The Three-Phase Cleaning Methodology
Professional post-construction cleaning follows a proven three-phase approach, each addressing specific debris types and residues.
Phase 1: Rough Cleaning (1-2 Days)
Rough cleaning occurs as construction progresses and especially after structural work concludes. This phase prioritises safety and creates workable environments.
Tasks include:
- Removal of large construction materials (drywall scraps, lumber, packaging)
- Collection and disposal of nails, screws, and metal debris
- Sweeping and vacuuming of construction dust and sawdust
- Removal of paint splatters, adhesive residue, and protective coverings
- Initial HVAC duct cleaning to prevent dust circulation
Key principle: Keeping sites clean throughout construction prevents dust resettlement and reduces overall cleaning time by 20-30%.
Phase 2: Light Cleaning (2-5 Days)
Once construction is substantially complete, light cleaning bridges the gap between rough cleanup and final polishing.
Tasks include:
- Deep sweeping and HEPA vacuuming of all floor surfaces
- Dusting of ceiling fixtures, air vents, and light fixtures
- Detailed wiping of walls to remove dust and construction residue
- Thorough mopping of all floor areas
- Initial cleaning of newly installed fixtures
- Detailed window cleaning and removal of protective coatings
- Bathroom and kitchen fixture cleaning and sanitisation
Phase 3: Final Cleaning (1-2 Days)
The final phase, typically occurring 3-5 days after light cleaning, ensures the space is pristine for immediate operations.
Tasks include:
- Spot-checking and touch-up cleaning where dust has resettled
- High-touch point sanitisation (door handles, light switches, railings)
- Final floor polishing and burnishing
- Detailed window and mirror polishing
- Cabinet interior and exterior cleaning
- Appliance and fixture polishing to remove fingerprints
- Final comprehensive walkthrough and quality assurance
The Critical Top-to-Bottom Protocol
The single most important principle in post-construction cleaning is always working from top to bottom. This prevents dust from falling onto already-cleaned surfaces.
Proper sequence:
- Ceiling fixtures and HVAC vents
- Ceiling surfaces
- Walls (top to bottom)
- Baseboards
- Floors (final step)
Contractors report 20-30% less rework when top-to-bottom methodology is followed consistently.
HEPA Vacuum Technology: The Industry Standard
Construction dust is a significant health hazard. HEPA (High-Efficiency Particulate Air) filtration is non-negotiable for professional operations.
Why HEPA is essential:
- HEPA filters capture 99.97% of particles as small as 0.3 microns
- Standard household vacuums recirculate dust into the air
- Prevents respiratory hazards from fine dust, silica, and construction residues
Best practice: Turn off HVAC systems during vacuuming to prevent dust circulation through the ventilation system.
Surface-Specific Cleaning Methods
Different surfaces require vastly different approaches. Using the wrong cleaning product causes permanent damage.
| Surface Type | Recommended Method | Products to Avoid |
|---|---|---|
| Hardwood Floors | Damp microfibre mop + hardwood cleaner | Excessive water, alkaline cleaners |
| Vinyl/Linoleum | Floor-specific cleaner + soft brushes | Abrasive scouring pads |
| Tile/Ceramic | Grout-specific cleaner + soft brush | Undiluted acid cleaners |
| Glass/Mirrors | Ammonia-free glass cleaner + squeegee | Paper towels (streaking) |
| Stone (Marble/Granite) | pH-neutral stone cleaner | Acidic cleaners, vinegar |
Ontario Regulation 480/24 Compliance
As of January 1, 2026, Ontario Regulation 480/24 establishes mandatory washroom cleaning standards for all workplaces.
Key requirements:
- All washroom facilities must be maintained clean and sanitary
- Cleaning records must document the date and time of the two most recent cleanings
- Records must be accessible to workers (posted physically or electronically)
- Cleanings should occur at least once every 24 hours
Business impact: For new commercial buildings, establishing compliant documentation from day one prevents future violations.
Ottawa-Specific Considerations
Winter Construction Challenges
Ottawa winters are severe, with temperatures regularly dropping below -10°C. During winter construction, excess moisture accumulation is critical.
Why this matters for cleaning:
- Concrete and masonry release significant moisture during curing
- Winter construction creates interior humidity levels 40-60% higher than exterior air
- Condensation damage to painted surfaces occurs frequently
Professional response: Post-construction cleaning must verify that all moisture-related damage has been remedied, including inspection for condensation damage and mold prevention verification.
Certificate of Occupancy Process
All new commercial construction in Ottawa must comply with the Ontario Building Code and City of Ottawa By-law No. 2014-220.
The process:
- Building Permit Application submitted
- Municipal officials assess OBC compliance
- Multiple inspections at critical construction stages
- Final inspection: Comprehensive building walkthrough
- Certificate of Occupancy issued only after final inspection passes
Important: Post-construction cleaning must occur after all final inspections pass but before business operations begin.
Pricing in Ottawa (2025)
Rate Structure
Typical hourly rates in Ottawa:
- Regular cleaning: $35-$45/hour
- Deep/specialised cleaning: $40-$55/hour
- Medical or food-service cleaning: $50-$75+/hour
Per-square-foot pricing:
- Standard rough cleaning: $0.15-$0.30/sq ft
- Final touch-up cleaning: $0.20-$0.50/sq ft
- Deep final cleaning: $0.50-$1.00+/sq ft
Example costs:
- Small commercial office (2,000-5,000 sq ft): $1,000-$3,000
- Larger commercial building (5,000+ sq ft): $2,500-$5,000+
DIY vs. Professional Cleaning
Hidden Costs of DIY
- Equipment rental: HEPA vacuums ($75-150/day), air scrubbers ($100-200/day)
- Cleaning supplies: Specialty products cost $300-800
- Time cost: Small projects require 3-7 days at skilled labour rates
- Damage risk: Wrong products permanently damage new surfaces
Professional Advantages
- Specialised knowledge prevents surface damage
- Insurance coverage protects against liability
- Compliance documentation for regulatory audits
- Speed (professionals complete in 2-3 days vs. 1-2 weeks DIY)
- Quality assurance with warranty coverage
Urban9 Post-Construction Cleaning Services
Urban9 Cleaning provides professional construction cleaning throughout Ottawa. Our trained teams understand Ontario regulations, proper surface treatment, and the unique challenges of new build cleanup.
Ready for professional post-construction cleaning? Contact Urban9 for a free quote on new build cleaning in Ottawa and surrounding areas.
Frequently Asked Questions
Q: When should post-construction cleaning start?
Rough cleaning should occur throughout construction. Light cleaning begins after major construction is complete but before final inspections. Final cleaning occurs after all inspections pass, ideally 3-5 days before occupancy.
Q: How long does post-construction cleaning take?
Timeline depends on project size: small renovation (1,000 sq ft) takes 1-2 days; new commercial space (5,000 sq ft) takes 4-6 days; large commercial buildings (10,000+ sq ft) require 2-4 weeks with multiple teams.
Q: What's included in post-construction deep cleaning?
Comprehensive service includes HEPA vacuuming of all surfaces, wall and ceiling dust removal, window and glass cleaning, fixture polishing, floor treatment appropriate to surface type, cabinet interior cleaning, and detailed documentation.
Q: How much does post-construction cleaning cost in Ottawa?
Ottawa rates range from $0.20-$1.00 per square foot depending on cleaning intensity. A typical 5,000 sq ft commercial space costs $2,000-$3,500 for complete three-phase cleaning.
Q: Is construction dust really harmful?
Yes. Construction dust contains fine particles (silica, drywall dust, paint particles) that remain airborne for hours. Professional cleaning with HEPA filtration removes 99.97% of these particles, protecting occupants and crews.
Q: What certifications should post-construction cleaners have?
Essential certifications include WHMIS training (mandatory in Ontario), WSIB coverage, height training certificates for elevated work, minimum $5 million insurance coverage, and general OH&S training.
Q: Can you clean during active construction?
Rough cleaning occurs throughout construction. However, final cleaning phases require construction to be substantially complete to prevent recontamination from ongoing work.
Q: What common mistakes should we avoid?
Common errors include skipping detailed checklists, rushing the cleaning process, using wrong cleaning products on new surfaces, mixing incompatible chemicals, and inadequate attention to hidden areas like behind appliances and inside cabinets.
Conclusion
Post-construction commercial cleaning is not a cost to minimise—it's a critical investment that directly impacts business success. A thoroughly cleaned, regulation-compliant space protects health, ensures compliance, preserves new surfaces, enables immediate occupancy, and creates positive first impressions.
For Ottawa business owners, partnering with certified, experienced post-construction cleaning professionals is the clear path to successful building handovers and operational readiness.
Ready for professional post-construction cleaning? Contact Urban9 Cleaning at 613-664-5678 or get a free quote today. Our team serves Ottawa, Kanata, Orleans, Barrhaven, Nepean, and surrounding areas with construction cleaning services built on expertise, compliance, and results.
Urban9 Cleaning provides professional construction cleaning and post-renovation cleanup throughout Ottawa and surrounding areas. Contact us for new build cleaning that meets Ontario's highest standards.




